Area power controller: Difference between revisions

From BeeStation Wiki
Jump to navigation Jump to search
imported>Kinglouisxiv
(Created page with "{{Needs revision|reason = This was marked for revision on oldwiki in 2011 described as a "placeholder." Since I don't fucking know what it's placeholding or what needs revisin...")
 
imported>Kinglouisxiv
(Cleaned up the guide a little and revised the explanation a bit. Removed the "revision" tag since it had been revised, but nobody bothered to remove the tag.)
Line 1: Line 1:
{{Needs revision|reason = This was marked for revision on oldwiki in 2011 described as a "placeholder." Since I don't fucking know what it's placeholding or what needs revising, I'm keeping in the message until I figure it out --[[User:Kinglouisxiv|Kinglouisxiv]] ([[User talk:Kinglouisxiv|talk]]) 17:02, 15 July 2013 (CEST).}}
==APC==
==APC==
An APC is an Area Power Controller (obviously).  These are used to provide power for a sector on the station.  To use an APC someone with a higher authority, such as a Research Director or an Engineer needs to swipe their card on an APC to unlock it. Once they do this, there are a few options available to them.
An APC is an Area Power Controller.  These are used to provide power for a sector on the station.  To use an APC, somebody with actual access to them, usually the [[Chief Engineer]] or an [[Engineer]], needs to swipe their card on an APC to unlock it. Once they do this, there are a few options available to them.


<b>Power: On/Off</b> - Toggles power to the APC
<b>Power: On/Off</b> - Toggles power to the APC
Line 18: Line 16:


==Replacing the Battery==
==Replacing the Battery==
To replace the APC battery, an Engineer (or other compatible authorities) must swipe their card on the APC.
To replace the APC battery, you need an ID with sufficient access to unlock the APC itself.<br>
<br>Then, the Engineer must disengage the protective cover.
 
<br>The cover can be taken off with a crowbar.
#Swipe your ID and unlock the interface.
<br>The Engineer can be free to remove the battery and insert a new one.
#Open the panel and disengage the cover lock.
<br>Once done, the Engineer can crowbar the cover back on, re-lock the cover, and lock the APC interface.
#Use a crowbar on the APC to open the cover.
#Take the battery out with a free hand and then place in the new one.
#Close the cover again with your crowbar, re-engage the cover lock and swipe your ID to secure the interface.


==Constructing an APC ==
==Constructing an APC ==

Revision as of 15:23, 15 July 2013

APC

An APC is an Area Power Controller. These are used to provide power for a sector on the station. To use an APC, somebody with actual access to them, usually the Chief Engineer or an Engineer, needs to swipe their card on an APC to unlock it. Once they do this, there are a few options available to them.

Power: On/Off - Toggles power to the APC
Main Breaker: On/Off - Toggles power to the APC
Equipment: Auto/On/Off - Toggles power to computers, doors, and other electronic equipment.
Lighting: Auto/On/Off - Toggles power to lighting in the area.
Environmental: Auto/On/Off - Toggles power to the ventilation in the area, as well as the Air Alarm.
Overcharge Lighting Circuit: Sends a pulse throughout the lighting circuit, making any lights shatter and send out sparks.
Cover Lock: Engaged/Disengaged: Provides a cover to protect the battery.

Remember, auto power slowly cuts off each breaker when power runs low in this order:

  1. Equipment
  2. Lighting
  3. Environment

Replacing the Battery

To replace the APC battery, you need an ID with sufficient access to unlock the APC itself.

  1. Swipe your ID and unlock the interface.
  2. Open the panel and disengage the cover lock.
  3. Use a crowbar on the APC to open the cover.
  4. Take the battery out with a free hand and then place in the new one.
  5. Close the cover again with your crowbar, re-engage the cover lock and swipe your ID to secure the interface.

Constructing an APC

See the guide to construction.