User:EvilDragon/mapping check list

From BeeStation Wiki
Revision as of 01:13, 30 May 2023 by EvilDragon (talk | contribs) (→‎Station Base)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Areas

Station Base

  • Disposal Pipe
  • Wires
  • APC
  • Disposal pipe
  • Trashroom
  • Maintenance tunnels
  • Arrival shuttle dock (MUST CHECK the dock size)
  • Departure shuttle dock (MUST CHECK the dock size - especially other purchasable shuttles - i.e. Raven shuttle which is biggest.)

Engineering

Solar

  • Solar control room
  1. Solar computer
  2. APC
  3. SME (single unit)

Supermatter

wer

Atmospheric

fsdaf

Command

werwer

Cargo

ert

Service

Hydroponics

  • Interactions
  1. Desk
  2. Desk bell
  3. Windoors
  4. Intercom
  5. Holocall
  6. Disposal
  • Hydroponics room:
  1. Hydroponics trays (at least 12)
  2. Seed maker
  3. Chem dispenser
  4. Watertank?
  • Botanist storage
  1. Hydrobe
  2. Botanist lockers
  3. Botanists' tool crate
  • Put it anywhere
  1. Biomass Generator
  2. Smartfridge (plant)
  3. Gene manipulator
  4. Grinder
  5. ChemMaster (Botany version)

Security

wer

Medical

Virology

  • There's no must-standard for the room format, but machine placement should follow a standard.
  1. Virologist workdesk must have Pandemic & Virologist fridge.

A good example

  1. Virologist workdesks are minimal. Don't put only a single desk.
  2. Virologist disposal leads to space.

Science

wer