Guide to construction: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)

17 March 2023

26 October 2022

10 October 2022

9 September 2022

17 June 2022

23 April 2022

16 June 2021

18 February 2021

9 May 2020

5 April 2020

11 February 2020

29 August 2019

22 August 2019

12 August 2019

  • curprev 11:4311:43, 12 August 2019imported>Angust 80,717 bytes +311 →‎64px Machines: Copied machine construction steps from machines page since they looked better. Replaced outdated wired machine frame with an already uploaded sprite

9 August 2019

26 July 2019

15 July 2019

24 June 2019

23 June 2019

22 June 2019

  • curprev 08:0208:02, 22 June 2019imported>Angustm 78,904 bytes 0 Replaced the last "knotted" entry on this guide.
  • curprev 08:0208:02, 22 June 2019imported>Angust 78,904 bytes −2,913 →‎Power Wires: Updated all wiring stuff to reflect Actioninja's wire changes. Moved most of it to the new page "Guide_to_wire_art". Feels sad to remove parts of this guide. Also I have no idea how to get pipe cleaners.

20 June 2019

1 June 2019

  • curprev 09:1109:11, 1 June 2019imported>Angust 81,776 bytes +504 "APC must be connected ''through a terminal'' (meaning you connect the terminal to the powernet)," <- what the hell does that mean? Changed it. Made all "machines" clickable. Corrected info about connecting machines. APC clarifications.

28 May 2019

26 May 2019

15 May 2019

12 May 2019

5 May 2019

2 May 2019

1 May 2019

22 April 2019

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)